PREPARATION FOR ECOLOGY WORKS STARTS
MONDAY, 8TH APRIL
We are in receipt of a Natural England license for trapping as part of upcoming ecological works.
This will include:
• Set up of receptor areas for newts and reptiles (2x separate areas to be fenced off and habitat enhancements made (overseeding and hibernacula / log piles created).
• Set up of trapping areas for the pitches, pavilion, access road and basin west of the entrance.
These set-up works are estimated to take about 4 weeks. Initially, the receptor areas will be set up and the fencing pegged out, which is likely to take a week or two, and then the fencing will be installed in earnest.
The attached plan from our Ecologist shows the areas that will be fenced. Areas A and E are the receptor areas within which the captured animals will be placed whilst the trapping takes place.
If you have any queries, please contact: William Neale William.Neale@secnewgate.co.uk